Mai -Star II the way forward

We have now removed the cabin off the boat and put it in the temporary workshop across the yard from Mai Star II so that the cabin sides can be worked on in the dry and any of the parts can be repaired while one of us is working on Mai Star II hull and get the frames and ribs made and in the case of the ribs steamed into position. The frames will have to be patterned up and made and then fixed into position. There is one major plank removal needed on the port side where the frame was fitted which caused the lank joint to fail as water ingress caused the butt end of the planks to rot. So there will be a plank to replace in that position. A good starting job for the new apprentice to undertake as he learns his trade as a boat builder of the future.

One of the most thankless jobs will be to remove all the paint from the inside of hull so that the hull can inspected  and checked for rot or other problems which will need to be sorted as we move forward with the project.


So hopefully over the coming weeks and months we should posting new updates of the progress on this and other projects .


Comments

Popular posts from this blog

Work done today on Mai Star II

Making patterns of the two foredeck lodging knees and inspecting the deck bems to see which of them can be salvaged and which need remaking.

The frame and inner hog repairs now done and now its time to make up and steam the ribs in place.