Making up thespacers for the hanging knees and the aft of the cabin upright posts to fit the aft of the cabin deck beams to an d then be able to fit the carlins and cabin sides.

 https://youtu.be/NFYW0uYMlK0

Making the spacers for the hanging knees ahead of the cabin front & making up the two upright posts for the aft end of main cabin to which the short aft deck beams will be jointed into with half lap and half dovetail joints. Also I am making up the spacers to go in between the hanging knees and the deck beam ahead of the main cabin and the grown frame on the hull to make the whole area a ring frame which will tie the deck beam to the hull framing and when the rig is under tension the stress will be spread around the whole structure and not just on one part of the hull. In the meantime, I will be making up studding to bolt the frames to the hanging knees and also the deck beam to the hanging knees


Comments

Popular posts from this blog

Work done today on Mai Star II

This week has been a few highs and lows

Major progress on Mai Star II's foredeck beams and carlins and mast block and post.