Next Jobs on Mai Star II, fitting the iron knees to the frames and deck beams and fixing the floor bearers in position and fitting the forward frame.

Before my apprentice left he clamped the iron knees in position apart from making and fitting the spacers in position. Once these are in position then the deck beams and the frames will make up a ring framework to take the stresses of the rig through the whole boat structure.


So on got to make up the spacers from some of the small pieces of oak we have laying around the workshop and then make up some fixing  bolts to bolt the knees to the frames a ns deck beams.


Then I will get on with the floor bearers which need fixing back in position so the cabin floor can go back down in the hull, making it easier to walk around on the inside to work on putting the carlins back in place.


 

Comments

Popular posts from this blog

Work done today on Mai Star II

This week has been a few highs and lows

Major progress on Mai Star II's foredeck beams and carlins and mast block and post.