An overview of the work on the hull and the cabin sides

The first major work on the hull is going to be on the port side forward which include replacing the missing ribs and the missing frame.


As can be seen from this photo the plank in the middle of the photo is adrift from the rest of the planking, this is because the frame behind this joint was rotten and the fixings had rotted away as well. 


The first of the cabin sides getting a good sanding back to bring the rich colour through again.


A large pile of boat parts to sort through and get rid of the parts which are not going to be used again.


Another pile of parts in the workshop that needs sorting through as well.


Yet another pile on another shelve to get sorted as well.


 

Comments

Popular posts from this blog

Work done today on Mai Star II

Making patterns of the two foredeck lodging knees and inspecting the deck bems to see which of them can be salvaged and which need remaking.

The frame and inner hog repairs now done and now its time to make up and steam the ribs in place.