Major progress on Mai Star II's foredeck beams and carlins and mast block and post.
The apprentice boat builder Ethan as been working hard on getting the foredeck beams finished off and making up two new carlins and side deck beams/
Mai Star II needed to have replacement carlins as the old carlins were broken and rotten at the ends as were the short side deck beams which were in a poor condition.
The next job to do before we can fit the new carlins and side deck beams is to make up a temporary aft cabin deck beam to go across the aft end of the cabin to fit the carlins. This is while we make up the vertical posts to fix the inboard end of the aft cabin beams.
The new mast pad fitted into the aft two deck beams as the original mast pad was, the only difference this time is that this pad will not have a hole drilled in the middle as per the original pad. This is because this time the mast which was cut down at sometime in the past will be fitted to a taberance . There will be a mast support post fitted to the underside of the deck as it was before the restoration.
Now that this is done the other work on the hull can continue as the boat is now more stable