Starting to put the parts together for the port side frame.

having cut all the ends of the section to the finished length and angle it is time to start putting the bevels on the two long sections


The shorter section will have the bevels planed on to them once the sections are put together with paint and softwood pegs.


The sections now laid on each other and now ready to marked up ready for the pegs to be driven through once they are ready.



The bevels bevels put on the two long sections.



 

Comments

Popular posts from this blog

Work done today on Mai Star II

This week has been a few highs and lows

Major steps forward with the fitting of the original deck beams and a couple of the new deck beams.