The frame and inner hog repairs now done and now its time to make up and steam the ribs in place.

The inner hog pieces now replaced and ready to be screwed and bedded down on a mixture of  red lead powder and linseed putty in the same method the original inner hog pieces were fitted almost 80 years ago.


The frames are all dry fitted and the same method to be used on the frames as are the inner hog pieces.


The same method will be used on these port side frames 


The grown floor which as come out of here will be replaced with a laminated oak as it is difficult to source a piece of oak with the grain pattern to make a new floor. 


 

Comments

Popular posts from this blog

Work done today on Mai Star II

Making patterns of the two foredeck lodging knees and inspecting the deck bems to see which of them can be salvaged and which need remaking.