Walk round Mai Star II on a sunny friday evening


 A walk round Mai Star II of a sunny Friday evening showing off the work that my apprentice as done on the inside of Mai Star II and the further challenges he and I have when we start on leveling and taking the twist out of the hull, which can be seen from the plump lines at both ends the aft is not so badly out of level however, the stem is almost an one and a half inches out of level. So there is going to be a lot of shores and braces put on the hull in different places to pull out the twist before any work can start on refitting the deck beams andany of major work to the hull and deck and in time refitting the cabin sides and roof..

Comments

Popular posts from this blog

Work done today on Mai Star II

Making patterns of the two foredeck lodging knees and inspecting the deck bems to see which of them can be salvaged and which need remaking.

The frame and inner hog repairs now done and now its time to make up and steam the ribs in place.